One document matched: draft-zhang-mif-connection-manager-arena-00.txt


Internet Engineering Task Force                               Y. Zhang 
Internet Draft                                            Leadcoretech 
Intended status: Informational                                    T. Sun 
Expires: August 2009                                        China Mobile 
                                                                 H. Chen 
                                                      February 27, 2009 
                                      
        Multi-interface Network Connection Manager in Arena Platform 
             draft-zhang-mif-connection-manager-arena-00.txt 


Status of this Memo 

   This Internet-Draft is submitted to IETF in full conformance with the 
   provisions of BCP 78 and BCP 79. 

   Internet-Drafts are working documents of the Internet Engineering 
   Task Force (IETF), its areas, and its working groups.  Note that 
   other groups may also distribute working documents as Internet-Drafts. 

   Internet-Drafts are draft documents valid for a maximum of six months 
   and may be updated, replaced, or obsoleted by other documents at any 
   time.  It is inappropriate to use Internet-Drafts as reference 
   material or to cite them other than as "work in progress." 

   The list of current Internet-Drafts can be accessed at 
   http://www.ietf.org/ietf/1id-abstracts.txt 

   The list of Internet-Draft Shadow Directories can be accessed at 
   http://www.ietf.org/shadow.html 

   This Internet-Draft will expire on August 27, 2009. 

Copyright Notice

   Copyright (c) 2009 IETF Trust and the persons identified as the
   document authors.  All rights reserved.

   This document is subject to BCP 78 and the IETF Trust's Legal
   Provisions Relating to IETF Documents
   (http://trustee.ietf.org/license-info) in effect on the date of
   publication of this document.  Please review these documents
   carefully, as they describe your rights and restrictions with respect
   to this document.

Abstract 


 
 
 
Zhang, Sun & Chen      Expires August 27, 2009                [Page 1] 

Internet-Draft  Connection Manager in Arena Platform     February 2009 
    

    This document presents a "Connection Manager" model implemented in 
the platform Arena, a mobile OS based on Linux. The introduction of 
Connection Manager brings two major benefits in Arena. First, it 
logically decouples the underlining connection approach with the 
connection management. Second, it plays a central role which executes 
the policy of OS, especially for multiple interfaces. 
Table of Contents 

    
   1. Introduction................................................2 
   2. Scenario....................................................2 
   3. Solution....................................................5 
      3.1. Work Flow..............................................5 
      3.2. Interface Reuse.........................................6 
      3.3. Link route consideration................................6 
   4. Conclusions.................................................7 
   5. References..................................................7 
    
1. Introduction 

    In current practices, most of applications maintain network by 
themselves. They directly connect to the network with given parameters 
leading to the coupling of operation and network management in logic 
level. Moreover, such type of mechanism does not meet variant 
requirements in multiple interfaces situations. 

    This document presents a Network Connect Manager solution which 
abstracts the network connect function to a class which can be used by 
the functions to get connection management services. The access 
approaches, parameter settings, management policies and connection 
management solicitation processes are handled based on OS predefined or 
application customized interface settings and are separate with the 
Network Connect Manager. In this way, the connection link related 
operations are separated with network management logically. This also 
makes it possible to address multiple interface cases. 

    This document will illustrate the scenarios where connection manger 
applies, the link management model and the procedure to use connection 
mananger. 
2. Scenario 

    There are three modes of interface selection as depicted in Figure 1. 
 
 
Zhang, Sun & Chen      Expires August 27, 2009                [Page 2] 

Internet-Draft  Connection Manager in Arena Platform     February 2009 
    

These modes are summarized as follows. 

    
UE                                                +-------------------------+ 
 |                +-----------------------+       | Default Wifi Internet   | 
 |                |Default Wifi Internet  |       |Connect Process          | 
 | User Select    |SSID:****              |======>|Disconnect Process       | 
 |--------------->|Password:****          |       |Link Status Query Process| 
 |                |......                 |       |Parameter Setting Process| 
 |                +-----------------------+       |Parameter Query Process  | 
 |                                                |......                   | 
 |                                                +-------------------------+  
 |                 +-----------------------+      +-------------------------+ 
 |                 |Default GPRS Internet  |      | Default GPRS Internet   | 
 |System automatic |Access Point Name:**** |      |Connect Process          |          
 |---------------->|User Name:****         |      |Disconnect Process       | 
 |   select        |Password:****          |=====>|Link Status Query Process|   
 |                 |Quality Of Service:****|      |Parameter Setting Process|  
 |                 |......                 |      |Parameter Query Process  | 
 |                 +-----------------------+      |......                   |          
 |                            :                   +-------------------------+ 
 |                            : 
 |                +------------------------+      +-------------------------+ 
 |                |Customize GPRS WAP      |      |    Customize GPRS WAP   | 
 |                |Default GPRS Internet   |      |Connect Process          | 
 |User Customize  |User Name:****          |      |Disconnect Process       | 
 |--------------->|Password:****           |=====>|Link Status Query Process| 
 |                |Uplink Rate:****        |      |Parameter Setting Process| 
 |                |Downlink Rate:****      |      |Parameter Query Process  | 
 |                |......                  |      |......                   | 
 |                +------------------------+      +-------------------------+ 
                Figure 1 There modes of interface selection  
 
      Interface Selection by an Application. If an application selects a 
      system default interface, it calls those default link management 
      service interfaces offered by the Network Connection Manager. 

      System Automatic Selection. If an application attempts to get 
      connected without specific requirements, the system will evaluate 
      various factors such as bandwidth, cost, stability, then select an 
      interface automatically for the application. 

 
 
Zhang, Sun & Chen      Expires August 27, 2009                [Page 3] 

Internet-Draft  Connection Manager in Arena Platform     February 2009 
    

      Creating New Interface based on Requirements. When all default 
      interfaces can't meet the requirement of an application, the 
      application can customize a new connect interface and configure 
      the connection parameters, define the detailed processes such as 
      connect, disconnect, status query, parameter settings and query. 
      Then the interface is registered to the Connection Manager. In 
      this way, a new interface is created and can be used as other 
      interfaces in Connection Manager. 
 
 
Figure 2 illustrates the mechanism of Connection Manager model. All the 
interfaces must register with the Connection Manager and link manage 
operations carry out via the multiple network connect interfaces.   
                         
                    Interfaces                                     
                    +--------+          +-------+            || 
    +-----+ Select  |Default | Register |       |            || 
    |App 1|-------->|GPRS    |--------->|       |--Connect-->|| 
    +-----+         |MMS     |          |       | Disconnect ||G 
                    +--------+          |Network|            ||P 
    +-----+ Selec   +--------+          |       |            ||R 
    |App 2|-------->|Default | Register |       |            ||S 
    +-----+         |GPRS    |--------->|       |--Connect-->|| 
                    |Internet|          |       | Disconnect || 
                    +--------+          |       |            || 
        :             :                 |Connect|            || 
        :             :                 |       |            || 
                    +---------+         |       |            || 
    +-------+Select |Customize| Register|       |            || 
    |App n-1|------>|GPRS     |-------->|       |--Connect-->||C 
    +-------+       |Internet |         |Manager| Disconnect ||S 
                    +---------+         |       |            ||D 
                                        |       |            || 
                                        |       |            || 
                    +---------+         |       |            ||W 
    +-----+ Select  |Customize| Register|       |            ||i  
    |App n|-------->|Wifi     |-------->|       |--Connect-->||f 
    +-----+         |Internet |         |       | Disconnect ||i 
                    +---------+         +-------+            ||: 
    
                 Figure 2 Network Connection Manager Model 



 
 
Zhang, Sun & Chen      Expires August 27, 2009                [Page 4] 

Internet-Draft  Connection Manager in Arena Platform     February 2009 
    

3. Connection Manager 

        3.1. Work Flow 

      Figure 3 demonstrates the working flow of the Network Connection 
   Manager. In the figure an application select a default interface 
   named "Default GPRS Internet" to connect with the network. 

       

       Application         Socket     Interface   Connection Manager             
        |                         |            |                          | 
        |        Select Default   |            |                          | 
    (1) |------GPRS Interface-----|----------->|                          | 
        |                         |            |                          | 
    (2) |                         |            |----Interface Register--->| 
        |                         |            |                          | 
    (3) |-------------- Connect Request(Default GPRS Internet)----------->| 
        |                         |            |                          | 
    (4) |                         |            |<---Call Connect Process--| 
        |                         |            |                          | 
    (5) |<------------------------|------------|------Connect Response----| 
        |                         |            |                          | 
    (6) |-------Create Socket---->|            |                          | 
        |                         |            |                          | 
    (7) |-------Bind Socket------>|            |                          | 
        |                         |            |                          | 
        |      Normal Socket      |            |                          | 
    (8) |<-----Communication----->|            |                          | 
        |                         |            |                          | 
    (9) |-----Close Socket------->|            |                          | 
        |                         |            |                          | 
        |                         |            |                          | 
    (10)|------------ Disconnect|Request(Default GPRS Internet)---------->| 
        |                         |            |                          | 
    (11)|                         |            |<-Call Disconnect Process-| 
        |                         |            |                          | 
    (12)|<------------------------|------------|--Disconnect Response-----| 
        |                         |            |                          | 
        |                         |            |                          | 
       

                Figure 3 Network Connection Manager Work Flow  

      The steps are listed as below: 


 
 
Zhang, Sun & Chen      Expires August 27, 2009                [Page 5] 

Internet-Draft  Connection Manager in Arena Platform     February 2009 
    

      1) An application selects a default interface named "Default GPRS 
         Internet" to connect with network; 

      2) The Default GPRS Internet interface registers with the 
         Connection Manager; 

      3) An application requests the Connection Manager to connect with 
         network via Default Network Interface connect interface; 

      4) When the Connection Manager receives the request of connection, 
         the Connection Manager will select one interface according to 
         the parameter required. The implementation of the interface on 
         connection is called to establish link for network access. 

      5) The Connection Manager informs the success of connection to the 
         application and saves the information about this link such as 
         PDP context, IP address, DNS etc.; 

      6) From step (6) to step (9), the application creates a socket and 
         binds it with the IP address of the active link. The 
         communication is established via the socket. The socket will be 
         closed at the end of the communication. 

      7) The disconnect procedures from step(10) to (12) are similar as, 
         previous procedures for connection establishment. 

      Note: In the case of interface customization, a new interface 
   should be created through configuring parameters and implement 
   network management at step (1). 

        3.2. Interface Reuse 

      The Connection Manager has the ability to make connections work 
   simultaneously. Multiple applications can share a connect interface 
   at the same time. In such situations, operations such as link 
   establish and disconnect will be shared. 

        3.3. Link route consideration 

   Under the circumstance that multiple interfaces are connected 
   simultaneously, applications should bind socket with IP address of 
   the corresponding interface to make sure that each socket created by 
   every application exactly communicate via its respective link and 
   route. 



 
 
Zhang, Sun & Chen      Expires August 27, 2009                [Page 6] 

Internet-Draft  Connection Manager in Arena Platform     February 2009 
    

4. Conclusions 

   The Connection Manager model in Arena platform improves the 
   efficiency for application developers and makes it convenient to 
   manage connections over variant network resources. Further work will 
   be conducted on link resource management, task scheduling and policy 
   control. 

5. Informative References 

   [I-D.hui-ip-multiple-connections-ps] Hui, M. and H. Deng, "Problem 
         Statement and Requirement of Simple IP Multi-homing of the 
         Host", draft-hui-ip-multiple-connections-ps-01 (work in              
         progress), November 2008. 

   [I-D.blanchet-mif-problem-statement] Blanchet, M., "Multiple 
         Interfaces Problem Statement", draft-blanchet-mif-problem-
         statement-00 (work in progress), December 2008.




























 
 
Zhang, Sun & Chen      Expires August 27, 2009                [Page 7] 

Internet-Draft  Connection Manager in Arena Platform     February 2009 
    

         Authors' Addresses 

   Yan Zhang 
   Leadcoretech Ltd. 
   333,qinjiang Ave., 
   Xuhui District, 
   Shanghai 200233 
   China 
   Email: zhangyan4@leadcoretech.com 
    
   Tao Sun 
   China Moible 
   53A,Xibianmennei Ave., 
   Xuanwu District, 
   Beijing 100053 
   China 
   Email: suntao@chinamobile.com 
    
   Hua Chen 
   Leadcoretech Ltd. 
   333,qinjiang Ave., 
   Xuhui District, 
   Shanghai 200233 
   China 
   Email: chenhua@leadcoretech.com 
    
    



















 
 
Zhang, Sun & Chen      Expires August 27, 2009                [Page 8] 


PAFTECH AB 2003-20262026-04-24 02:50:28